Daejeon · Since 2019

Half-Rack Shelves, Full Verdicts

We inspect, bench-test, and document mining units rated at 0.05 TH/s and above — then tell you plainly whether they belong on your compact rack shelf or in the spare-parts bin.

What We Measure on Every Shelf Visit

A compact rack is unforgiving. Heat stacks behind the rear bezel, power cables fight for PDU slots, and a single misaligned bracket can void a warranty. Our reviewers arrive with thermal probes, clamp meters, and a checklist built from six years of shelf audits across Daejeon and the surrounding Chungcheong facilities.

Each report covers intake clearance, exhaust path, hash-rate stability under load, acoustic profile at one metre, and whether the unit's stated 0.05 TH/s floor holds after thirty minutes of continuous operation.

Technician measuring airflow behind a compact mining rack shelf

Equipment Review Services

On-site and bench assessments for operators running compact rack configurations.

Home

From ₩540,000

Power & Thermal Audit

Measure what your PDUs are actually carrying and whether your shelf exhaust paths are recycling heat back into intake.

View Details

See All Reviews & Assessments

From the Field Notes

Practical write-ups on shelf ventilation, unit selection, and power distribution.

Operator Accounts

They flagged that our rear exhaust was recycling hot air from the shelf below — something our own team had walked past for months. The written report included photos at each U-position so our electrician could fix it the same afternoon.
— Min-jun H., small-scale operator, Sejong
Straightforward bench test on three used units we were considering. Two met the 0.05 TH/s claim; one did not. I appreciated that they did not try to upsell replacements — just gave us the numbers.
— Yuna K., facility manager, Daejeon

More Client Stories