Rates & Estimate Guide
Fees based on scope — not subscription tiers.
Our rates reflect the time, travel, and instrumentation required for each engagement. All prices are in Korean won (KRW) and are informational. Final quotes are confirmed after a brief scope discussion.
Rack Shelf Layout Assessment
| Scope | Starting Rate | Notes |
|---|---|---|
| Single half-rack shelf (up to 4 U) | ₩380,000 | Includes on-site visit within Daejeon city |
| Full compact rack (up to 20 U) | ₩720,000 | Multi-shelf thermal mapping included |
| Additional shelf beyond base scope | ₩95,000 per shelf | Applies to same visit |
Travel outside Daejeon metropolitan area: ₩45,000 base + ₩18/km one way.
Bench Testing (Per Unit)
| Unit hash-rate class | Per-unit fee |
|---|---|
| 0.05 – 0.15 TH/s | ₩120,000 |
| 0.16 – 0.50 TH/s | ₩165,000 |
| Above 0.50 TH/s | ₩210,000 |
Bench tests include thirty-minute sustained load logging, thermal imaging at three points, and a one-page summary per unit.
Power & Thermal Audit
Flat rate of ₩540,000 for facilities with up to two PDUs and eight shelf positions. Covers circuit load measurement, hot-aisle/cold-aisle assessment, and written remediation suggestions.
ASIC Selection Consultation
₩280,000 for a ninety-minute session (in-office or video). Includes a written shortlist of three to five units matched to your stated shelf dimensions, power budget, and noise constraints.
Installation Supervision
₩195,000 per half-day on site. Reviewer observes mounting, cable dressing, and initial power-up. Does not include physical installation labour.
Estimate Factors
Final pricing may vary based on:
- Number of units and shelf positions reviewed
- Distance from our Daejeon office
- Urgency (same-week visits carry a 15% scheduling surcharge)
- Need for repeat visits to verify remedial work
Payment & Deposits
A 40% deposit secures your visit date. The balance is due upon report delivery. We accept bank transfer; payment details are provided in your booking confirmation.
What Is Not Included
Hardware purchase, electrical contracting, rack fabrication, ongoing monitoring, or pool configuration. Those remain your responsibility or that of your chosen contractors.